There have been several in the past few weeks. First, the old deck was tore down in lieu of creating a new patio. Then, the electrical cable running from the house to the garage was trenched a week ago. On Monday, the two stumps left over from the mulberry trees that were cut down in our yard were chipped away and removed. Lastly, the boot vent pipe running out of our house through the roof was replaced and sealed. There had been leakage onto the 3rd floor through the old and brittle seal. That got replaced and now we are hoping that there is no more water coming in. Fingers crossed.
Thursday, June 23, 2011
Subscribe to:
Post Comments (Atom)


0 comments:
Post a Comment